Glossaire
Opérations de vol
Remise des gaz (Go-Around)
Embed This Widget
Add the script tag and a data attribute to embed this widget.
Embed via iframe for maximum compatibility.
<iframe src="https://airportfyi.com/iframe/glossary/go-around/" width="420" height="400" frameborder="0" style="border:0;border-radius:10px;max-width:100%" loading="lazy"></iframe>
Paste this URL in WordPress, Medium, or any oEmbed-compatible platform.
https://airportfyi.com/glossary/go-around/
Add a dynamic SVG badge to your README or docs.
[](https://airportfyi.com/glossary/go-around/)
Use the native HTML custom element.
Définition
An aborted landing where the aircraft applies full power and climbs away from the runway
Termes associés
Hauteur de décision (DH: Decision Height)
The altitude during a precision approach at which the pilot must decide to land or go around
Atterrissage (Landing)
The final phase of flight where an aircraft descends to the runway surface
Approche interrompue (Missed Approach)
A procedure followed when an aircraft cannot complete a landing approach safely
Cisaillement du vent (Wind Shear)
A sudden change in wind speed or direction over a short distance, hazardous during takeoff and landing
Mentioned In
Frequently Asked Questions
What is Remise des gaz (Go-Around)?
An aborted landing where the aircraft applies full power and climbs away from the runway
How does Remise des gaz (Go-Around) relate to other aviation concepts?
Remise des gaz (Go-Around) is closely related to Decision Height and Landing, among other key aviation concepts.
Plus dans Opérations de vol
Bloquer le carburant (Block Fuel)
Temps de blocage (Block Time)
Montée (Climb)
Atterrissage par vent traversier (Crosswind Landing)
Croisière (Cruise)
Descente (Descent)
Déroutement (Diversion)
ETOPS (ETOPS)
Vol en ferry (Ferry Flight)
Arrondi (Flare)
Plan de vol (FPL: Flight Plan)
Itinéraire du Grand Cercle (GCR: Great Circle Route)
Circuit d'attente (Holding Pattern)
Atterrissage (Landing)
Vol de positionnement (Positioning Flight)
Ligne de rhume (Rhumb Line)
Vitesse de rotation (Vr) (Vr: Rotation (Vr))
Décollage (Takeoff)
Arrêt technique (Technical Stop)
Délai d'exécution (Turnaround Time)
Temps de mise en route (Wheels-Up Time)